← Back to technical FAQ
Anjelio Automation · Technical article

Voltage, plugs, and who installs an exported labeling machine

Power, plug, and installation responsibility are order-specific. Confirm them before the machine is built, not after it lands.

Author: UAT Administrator · Published: 2026-09-12T04:54:26.311327525+00:00 · Substantively updated: 2026-09-12T04:54:26.311642107+00:00

A vision cell that runs in Guangdong will not automatically match a plant in Texas or Düsseldorf.

Confirm in writing:

Embedded cells (VL-EM) need extra interface detail: transfer height, part-present signal, and maintenance access. Standalone conveyor cells still need a named installer.

This site does not sell a universal “export-ready” certification pack. If you need a specific mark or a US electrician’s connection drawing, put it in the inquiry. We will say yes, no, or quote the extra work.

Embedded inline · Contact

Frequently asked questions

Is the machine CE or UL listed as standard?

Not from this page. Regulatory marks are provided only when they are specified, tested, and documented for that order.

Can you install in the United States?

Only when site work is quoted. Otherwise the buyer or a local integrator installs, with remote support from Huizhou.

Sources and evidence

Related products

Need a recommendation for your product, label, or line speed?
Talk to Anjelio engineering