VL-PA
Inline Print and Apply Vision Labeler
Variable information such as barcodes, QR codes, serial numbers and production dates is printed and applied in one workflow. Barcode verification and production-system interfaces can be evaluated as configuration options. Confirm artwork, label size, data transfer and reprint rules. Print quality, placement and exception handling must be validated for the selected setup.
Talk to our team →
Updated:
Key technical parameters
| Applicator heads (configuration dependent) | 1 |
|---|---|
| Catalogue reference rate; subject to sample validation | 800–1200 labels/h |
Final configuration is subject to the mutually confirmed technical proposal and quotation.
Application scope
- Printing and traceability
- Packaging labels
Fit requirements
Confirm the following inputs to validate fit with your product and production line.
- Part shape, dimensions, locating features, and how it is presented
- Label or auxiliary-material size, liner, adhesive, and reel size
- Target rate plus upstream/downstream equipment, signals, and available space
- Actual parts and materials for sample placement and written confirmation
Helpful information for inquiry
- Photos or drawings of the part, with the placement position marked
- A label/material sample or material datasheet
- Supply voltage, who will install the machine, and the target delivery window
Downloads & brochures
Frequently asked questions
How do I confirm this configuration fits my part?
Send the part, material, and placement position. Engineering confirms release, location, tooling, and rate from samples; catalogue rates are not a substitute for a trial. Final scope follows the written technical proposal.
Is the published rate a guaranteed output?
No. It is a catalogue reference range and changes with the part, material, locating method, and changeover. Contracted output is only stated after sample validation.
What happens after I send an inquiry?
We first confirm configuration fit, then schedule a sample or drawing review, and issue scope, lead time, and installation responsibility. Factory acceptance (FAT) is included only when it is written into the proposal.
Project inquiry
Share the essential process data and we will confirm model fit, interfaces, and delivery scope.
Talk to our team →Technical Articles
Vision Labeler RFQ Checklist: Quote Scope, Lead Time, and Acceptance
Help procurement write a comparable vision-labeler RFQ — itemized quote scope (host/vision/fixtures/install/training/tax-freight), lead-time start, and acceptance pointers.
PCB Label Before vs After Reflow: Station Timing and Film Class
Choose whether to apply PCB identity before reflow or after soldering, and frame polyimide vs polyester as a qualified materials decision for Anjelio vision label application.
PnP SMT Label Feeder (ALF) vs Dedicated CCD Vision PCB Labeler
When a pick-and-place label feeder is enough, and when you need a dedicated CCD vision labeling cell (Anjelio VL-*).
Panel-Rail vs Per-Board PCB Labeling Before Depaneling
When panel-rail (process-edge) labeling is enough, and when each child board needs its own code before depaneling.